Building Mark V 20
Sep 01
Home
Nov 00
Dec 00
Jan 01
Feb 01
Mar 01
Apr 01
May 01
Jun 01
Jul 01
Aug 01
Sep 01
In the water

September 2001

Almost ready to launch

The window frames were routed for the plexiglass. It would have been easier if they were routed before assembly, as the router didn't fit in some places.
The cabin sides and roof were painted.
The foreward hatch was also completed.

The 1/4" plexiglass windows were installed. Wiring was completed, a fishfinder was also installed. The cockpit floor was painted. You can see the portable toilet in its own locker. A hinged lid was installed over the outboard well.

Aft end of cockpit

Motor well

Helm

To the next page...

In the water