Building Mark V 39
Jan 01
Home
Sep 00
Oct 00
Nov 00
Jan 01
Feb 01
Mar 01
Apr 01
May 01
Jun 01
Interior
Exterior
Launching 1
Launching 2
Done

December 2000, and January 2001.

Central Missouri was a little colder than necessary in December, and I had a hard time heating my shop, so I didn't get much done.

The roof is 1 layer of 1/2" plywood, and the sides are 1/4" plywood. There will be paneling inside, so the walls and roof will be hollow.

The floor in the head is raised a few inches to allow a sump for the shower drain, which will be in the box to the right.

cabin side, bow view

inside, facing forward
Looking forward

Me and boat
Me

forepeak detail
Forepeak

head floot support
Head floor supports

To the next page...

Feb 01