The cabin sides and window frames were painted with latex house paint before installing. The window glass was 1/4" plexiglass set in frames with battens nailed on with brass brads. The opening windows were installed with butt-hinges, the other windows were screwed in place. All the windows used up 3 4-by-8 sheets of plexiglass. I still don't know how soon I'll loose the shop, could be as early as April 1, so I will have the boat ready to move if neccessary. I strung all the wiring and hoses so I can start to install the interior panelling. See the nice pile of scrap, and my 12 foot Glen-L Power Skiff. |